# Handoff **From:** ARCHITECT **To:** ENGINEER **ECR:** ECR-001 **State:** design → coding **Date:** 2026-08-05 ## Artifacts - [x] ECR (Approved) - [x] PRODUCT_SPEC - [x] ENGINEERING_SPEC - [x] RISK_REVIEW (N/A) - [x] ADR-001 - [x] TRACEABILITY - [ ] TEST_REPORT / CODE_REVIEW / EXP (engineer / reviewer) ## Restrictions — Do not modify - `config/`、`strategies/` 内容 - 缠论算法语义、`/api/analyze` 破坏性变更 - 计划文件本身 ## Goal for receiver 按 ENGINEERING_SPEC 完成包化、TF_DF 拆分、Web 分层、前端模块化、golden 测试与文档收尾。 ## Done for this hop - [x] ESS docs 落盘 - [x] ECR Approved(计划实施授权) ## References - `docs/ECR/ECR-001-chan-web-restructure.md` - `docs/ENGINEERING_SPEC/ECR-001-restructure.md` - Plan: ESS Chan Refactor(1B+2B)